Strategies for Improving Operation Efficiency of Mining Bolt Rigs
This paper focuses on the 20103 fully-mechanized mining face of Qinyu Coal Mine, analyzing geological conditions, supporting systems, existing bolt rig problems, and putting forward optimized equipment selection, process parameters, and efficiency-improving strategies with complete field data.
1. Working Face & Geological Conditions
- Strike length: 1707 m, mining width: 160 m, mining height: 1.7 m
- Buried depth: 150–320 m, seam dip: 0–8°
- Immediate roof: sandy mudstone, thickness 2.5–4.2 m, UCS 36 MPa
- Main roof: medium-grained sandstone, thickness 6.5–7.8 m, UCS 35.2–36.8 MPa
- Floor: mudstone, UCS 8–10.5 MPa, water absorption 5.16%
2. Bolt Support System Parameters
- Support type: bolt + cable + beam + mesh
- Bolt: Φ20 mm, 2300 mm left-hand rebar
- Cable: Φ17.8 mm steel strand, 7300 mm / 9300 mm
- Row & spacing: 800 mm×800 mm, 600 mm×600 mm in broken zones
- Roof separation: controlled within 50 mm
3. Existing Rig Problems (ZDY-1250)
- Torque: 1250 N·m, insufficient for hard rock
- Drilling efficiency: only 1.0–1.2 m/min in hard rock
- Angle deviation: exceeds ±5°, low positioning accuracy
- No automatic grouting system, unstable anchoring quality
- Large size, poor mobility, high labor intensity
4. Rig Selection & Parameter Optimization
- Required minimum torque: 830 N·m
- Recommended upgrade: ZDY-1900 hydraulic bolt rig
- Hole diameter: 42 mm, hole depth: 2.3–4.5 m
- Drill bit: carbide spiral wing type
- Angle control: within ±3° with laser guidance
| Rig Model | Rock Type | Efficiency (m/min) |
|---|---|---|
| ZDY-1250 | Siltstone | 1.10 |
| ZDY-1900 | Siltstone | 2.00 |
| ZDY-1900 | Medium-grained Sandstone | 1.78 |
| ZDY-2500L | Sandstone + Coal | 2.13 |
5. Efficiency Improvement Strategies
- Enhance geological adaptability: 3-speed hydraulic motor, stable propulsion
- Automatic collaborative control: auto-alignment, auto-drilling, auto-grouting
- Positioning error: within ±2°, hole repeatability: 95%
- Average drilling cycle: from 6.2 min reduced to 4.1 min
- Support time reduced by 28.7%, error reduced by 42%
- Fault early warning: oil temperature > 65°C triggers automatic protection
6. Conclusion
- Upgrading to ZDY-1900 significantly improves drilling efficiency and stability
- Optimized parameters and laser guidance greatly improve hole quality
- Automatic collaborative control greatly reduces working time and labor intensity
- The strategy can be widely applied in similar coal mine working faces
Summary
By optimizing rig selection, drilling parameters, collaborative control, and maintenance mechanisms, the operation efficiency of bolt rigs is greatly improved, providing a strong guarantee for roadway support quality and mine safety production.
Contact Us